Welcome to the OWOW Forum.
Rules & Community Messages
Rules of engagement
Documents on the process
Documents on Prop 84
General discussions on OWOW
Documents
Map of Proposed Prioritized OWOW Project Ranking
OWOW Submitted Projects (under construction)
City of Fontana Flood Control and Aquifer Recharge Program
Homeland/ Romoland Watershed Drainage Project
San Jacinto Wildlife Area Habitat Sustainability and Enhancement Utilizing Recycled Water
Repairs to the Unlined RCP Reach IVA and Reach IVB Santa Ana Regional Interceptor (SARI)
San Jacinto Indirect Potable Reuse
Perris II Desalination Facility
Sludge Dewatering, Odor Control, and Primary Sludge Thickening at Plant No. 1, Project No. P1-101
Storm Water Capture and Groundwater Recharge in the Perris North Groundwater Management Zone
Cactus Basins No. 3 and No. 3A
Temescal Gardens Online
Hemet/San Jacinto Integrated Recharge and Recovery Program Phase II
Groundwater Replenishment System - Flow Equalization
Regional Recycling Plant No.5 Expansion
RP-5 De-bottlenecking and RP-2 Capacity Improvement
Industrial Way Water Quality and Storm Drain Improvement Project
Arlington Desalter Connection Project No. 27-1208 & Western Municipal Water District Promenade Connection
West Fontana Basin
Perris II Desalter Ancillary Facilities
Groundwater Replenishment System Expansion
San Jacinto River Gap Project
Cucamonga Creek Watershed Regional Water Quality Project (Mill Creek Wetlands)
Infiltration and Inflow Reduction Program
Brine Line (SARI) SCADA System
Place-Based GIS Land Use Design Tool to Protect Watershed Function in the Upper Santa Ana River Watershed
Modjeska Park Parking Detention/Infiltration Facility (Design Only)
Constructed Wetland Habitat Restoration and Water Reclamation project for the Santa Ana River Borrow Pit.
San Bernardino National Forest Ecological Restoration and Watershed Improvement
East Garden Grove Wintersburg Channel Urban Runoff Diversion Project, Phase I
Cable Creek Basin and Spreading Grounds
Characterization and optimization of cost-effective treatment wetlands for surface water quality improvement
Sun City Force Main and Recycled Water Pipeline Replacement
Arlington Basin Water Quality Improvement Project
San Jacinto Urban Runoff Treatment & Control
Pharmaceutical Collection Program
San Jacinto Watershed Nutrient TMDL Pollutant Trading Study
The Quail Valley Groundwater Infiltration Improvements Project
Sunset Gap Seawater Intrusion
Chino Creek Multipurpose Corridor
San Jacinto River Riparian Habitat Restoration
Mission Zanja Creek Feasibility Study
Lake Elsinore Water Quality Modeling
IEUA Regional Water Budget Program
Enhanced Stormwater Capture and Recharge along the Santa Ana River
Etiwanda/San Sevaine Basins 1 through 4
Regional Residential Landscape Retrofit Program
Lake Elsinore Alum/Phoslock Treatment
Watershed Action Plan
Drainage A Detention Basin
Regional Residential Landscape Financing Program
Regional Commercial Incentive Program
Lake Elsinore & Canyon Lake Nutrient TMDL Monitoring
Chino Creek Wellfield, Wells 1, 2, and 3
Central Orange County Trash Reduction Project
La Sierra Pipeline Project
Quail Valley Sewer Improvements (Subarea 9)
Orange County LID Implementation Project
Regional Public Sector Program
Lake Elsinore Fishery Enhancement
Mill Creek Diversion Project
Brine Line (SARI) Flow Equalization Structure
River Road Treatment Wetlands
San Bernardino Clean Water Factory – Phase I
Borrego Canyon Wash Stabilization and Restoration Project
Wells 21 and 22 Project
Upper Santa Ana Watershed Alluvial Scrub Habitat Restoration Project and Mitigation Banking Assessment
Cypress Channel Multipurpose Corridor
Wineville Extension Pipeline
Baker Water Treatment Plant Project
Temescal Gardens
Strand Ranch Water Banking Project Recovery Wells and Conveyance Facilities
Mid-Basin Injection Project
Santa Ana Watershed Vireo Monitoring and Breeding Bird Surveys
Big Bear Lake Hypolimnetic Oxygenation System
Renewable Energy Expansion Program
Brine Line Maintenance Access Structures, Reach V and Reach IVB
930-Zone Pipeline and Reservoir, Expansion of the CCWRF-RP-1 S.Zone Pump Station and Installation of a Parallel Line to RP-1 Outfall
Stormwater Treatment Wetlands for Canyon Lake
Lake Mathews Watershed Master Water Quality Improvement Project Phase II
In-Conduit Hydroelectric Project
Lytle Cajon Basin
Fletcher Basin Rehabilitation
Canyon Lake Dredging Enhancements
Orange County Regional Stormwater Infiltration Program
Brine Line (SARI) Solids Control Structures
East Diamond Valley Recycled Water Storage Pond and Distribution Pipeline Project
ARTIC Use of GWRS Water for Irrigation and Groudwater Recharge
Borrego Canyon Wash Bypass Channel Improvements within the portion of Shea/Baker Ranch Property (Bypass Channel)
Chino II Desalter Brine Minimization
Canyon Lake Alum/Phoslock Treatment
Perchlorate Wellhead Treatment System Pipelines
Water Conservation Demonstration Garden
Santiago Enhanced Recharge
Hypolimnetic Oxygenation System for Canyon Lake
Enhanced Water Conservation at Prado
Magnolia Channel Detention Basin
Santiago Basins Pump Station
Riverside North Aquifer Storage and Recovery Project
A Shared Workspace is the Foundation for Collaborative Watershed Management.
Water Use Effieciency Program
Perchlorate Wellhead Treatment System Wells and SCADA
The San Jacinto Citrus In-Lieu Recycled Water Pond Pump Station and Distribution Pipeline Project
Santa Ana River Interceptor (SARI) Line Relocation Project
Quail Valley Sewer Improvements (Subareas 1-8)
Inland Empire Brine Line Capacity Pool Program
Perris Water Filtration Plant Reject Recovery Facility
Natural Treatment System Facility No. 62 (NTS-62)
Enhanced Stormwater Capture and Recharge along the Santa Ana River Phase II
14th Street Groundwater Recharge and Storm Water Quality Treatment Integration Facility
Recycled Water Transmission Main (Santa Ana River Segment)
Fairview Park Wetlands and Riparian Habitat Project
Miraloma Recharge Basin
EMWD Desalination Recovery Enhancement and Brine Concentrate Management Demonstration Facility
Groundwater Interception and Conveyance System for Selenium Load Reduction at the Lower Peters Canyon Wash, Orange County, California
East Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from Tidegates to upstream Warner Avenue.
East Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from upstream Warner Avenue to downstream Goldenwest Street.
Randolph Creek Water Quality and Habitat Enhancement Project
Chino Creek Wetlands
Colored Water Treatment Facility Technology Replacement and Expansion
Mid-Basin Injection Demonstration
Brookhurst Widening Bio-Swale and Synthetic Turf Installation
North Basin Groundwater Protection Project
Irvine Ranch Water District Advanced Metering Infrastructure (AMI) Project
French Valley Recycled Water Distribution Pipeline Project
The Menifee Recycled Water Pond Pump Station and Distribution Pipeline Project
San Bernardino River Corridor Revitalization
Hickory / Banana Basin Turout Flow Meter
Orange Park Acres Groundwater Supplies and Conveyance Facilities
Well 17 & 18 Water Treatment Facility
Second Lower Cross Feeder Project
City of Tustin Main Street Facility Improvements
Riverside-Corona Feeder Wells
Serrano Creek Restoration Plan
SMART Landscapes
Chino II Desalter Treated Water Pump Station
Agency Wide Aeration System Modifications
Construction and Quantitative Evaluation of the Low Impact Development Retrofit Project for Orange County Public Works Glassell Yard, Orange, California
Model Institutional Water Conservation Makeover
Water Use Efficiency Improvements/Brackish Groundwater Treatment and Constructed Wetland Installation at Yorba Regional Park
Haster Retarding Basin and Pump Station (OCFCD Facility No. C05B02/C05PS1)
Huntington Harbour Copper Reduction Project
Local Recycled Water Laterals Construction
Restoration of the Lower Santa Ana River Marsh
City of Fontana Local Recycled Water Distribution Facilities
Montclair Basin SCADA improvments
Eastvale Water Recycling Project
San Jacinto Recycled Water Distribution Pipeline Project
Huntington Harbour Water Quality Improvemnent Program
RP-5 Wind Turbine
Turner Basin Improvements
DWR Pump Station Alternative 1
Non-Potable Water Distribution System and Van Buren Bridge Recycled Water Pipeline
Five Coves and Lincoln Basins Bypass Pipeline
Prado Basin Sediment Management Project
Cypress Nature Park Restoration Project
Local Recycled Water Laterals Construction
Central Area Recycled Water Project
San Bernardino Clean Water Factory – Phase IV
Temescal Creek Master Trail and Park Project
Ely Basin Cla Valve Replacement and Electrial Service
Jurupa Pumpstation
Motorized Gate Actuator Installation at RP-3
Co-generation Facilities Cooling Water System Modifications and Upgrades Project J-109.
Syphon Reservoir Expansion
Water Recycling Demonstration Project
East Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from upstream Oceanview Channel (C06) Confluence to downstream Beach Boulevard.
East Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from upstream Quartz Street to upstream Bushard Street.
Roger B. Teagarden Ion Exchange Treatment Plant (IXP) Expansion
East Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from upstream Beach Boulvevard to downstream Woodruff Street.
Baseline Feeder Well Replacement Project
South Basin Groundwater Protection Project Interim Remediation
West End Pump Station
Norco/Stagecoach Park Recycled Waterline
East Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from 300-feet downstream the intersection of Haster Street/Lampson Avenue to 800-feet upstream.
Joint Anaheim/IRWD Well Field
Recycled Water Reservoir
Goldenwest 6 MG Tank
East Garden Grove-Wintersburg Channel (OCFCD Facility No. C05) from upstream Bushard Street to upstream the intersection of McFadden Street/Brookhurst Street.
Arlington Desalter Biodenitrification Construction
CMSD #101 West Side Pumping Station Abandonment
City of Chino Hills Local Recycled Water Distribution Facilities
Ocean View Channel (OCFCD Facility No. C06) from upstream of the Confluence with East Garden Grove-Wintersburg Channel (C05) to downstream Beach Boulevard.
San Bernardino Clean Water Factory – Phase V
San Jacinto Watershed Urban and Agricultural Land Use Survey and Impervious Surface Mapping
24" Mission Blvd Pipeline (Carrera to Goldenwest tank)
Non-Potable Water Distribution System and Indian Hills Wastewater Treatment Plant Rehabilitation
San Bernardino Clean Water Factory – Phase II
Tustin Avenue Well
City of Chino Local Recycled Water Distribution Facilities
Rhine Channel Remediation Project
North Trumble Recycled Water Storage Ponds
Syphon Reservoir Integration Project
San Bernardino Clean Water Factory – Phase VI
Crescent Avenue Sewer Replacement
San Sevaine Lateral and Turnouts
Wintersberg Chanel Source Identification Study
Hickory Basin Conservation Berm Outlet Modification
Ocean View Channel (OCFCD Facility No. C06) from upstream of Beach Boulevard to downstream of Newland Street.
Jurupa Force Main Outlet Modifications
Santa Ana-Delhi Channel (OCFCD Facility No. F01) from Upper Newport Back Bay to downstream of Mesa Drive.
Brea Creek Channel (OCFCD Facility No. A02) at Beach Boulevard.
Pacific Avenue 16" and 12" Water Pipeline
Natural Treatment System Site 67
Rawlings Reservoir Replacement
Westminster Channel (OCFCD Facility No. C04) from downstream Bolsa Chica Street to upstream the intersection of Springdale Street and Edinger Avenue.
Westminster Channel (OCFCD Facility No. C04) from upstream the intersection of Springdale Street and Edinger Avenue to downstream Bolsa Avenue.
Rubidoux Community Services District Emergency Interconnections
Wilson III Basins Project and Wilson Basins/Spreading Grounds
Lane Channel (OCFCD Facility No. F08) from Confluence with F05 channel to Von Karman
Lane Channel (OCFCD Facility No. F08) from Von Karman to 1000’ downstream Redhill Avenue
Fullerton Creek Channel (OCFCD Facility No. A03) from downstream Western Ave to downstream Beach Blvd.
Planning & Integration Assistance Program
Ocean View Channel (OCFCD Facility No. C06) from downstream of Bushard Street to downstream of Brookhurst Street.
Raymond Basin Enhancement Project
Newland Storm Channel (OCFCD Facility No. C05S01) from Confluence with C05 channel to downstream McFadden Avenue.
Seven Oaks Dam and Reservoir Construction Area
Santa Ana River Construction Area
NEW 12-INCH RECYCLED WATER MAIN TO THE REDHILL GOLF COURSE
Carbon Creek Channel (OCFCD Facility No. B01) from upstream Beach Boulevard to upstream Dale Street.
PROPOSED 8-INCH REDHILL PARK LATERAL
1N09 Reconstruction and Water Quality Improvement
Prado Basin Sediment Management Demonstration Project
Construction Circle Recycled Water Conversion Project
Newland Storm Channel (OCFCD Facility No. C05S01) from downstream McFadden Avenue to downstream Bolsa Avenue
Carbon Creek Channel (OCFCD Facility No. B01) from upstream Orange to upstream Beach Boulevard.
Placentia Basin Enhancement Project
Fullerton Creek Channel (OCFCD Facility No. A03) from downstream Beach Blvd. including undercrossing to downstream I-5 Freeway.
Fullerton Creek Channel (OCFCD Facility No. A03) from downstream I-5 Freeway to downstream Dale Street.
Carbon Creek Channel (OCFCD Facility No. B01) from downstream Western Avenue to upstream Orange (including both undercrossings).
Recharge Water Sediment Removal Demonstration Project
Active Recharge Project in the Tributaries of the Santa Ana River
University of California Irvine Water Use Efficiency Upgrades
Perris Valley Recycled Water Distribution Pipeline Project
Recharge Water Sediment Removal Project
Platinum Triangle/ARTIC and Disneyland Resort Area Water Recycling Project
Peters Canyon Channel (OCFCD Facility No. F06) from Barranca Parkway to Warner Avenue.
Temescal Creek Wetlands
Citywide Street Median Rehabilitation Project
Ball Road Regional Recycled Water Project
Santa Ana-Santa Fe Channel (OCFCD Facility No. F10) from confluence with Peters Canyon Channel to downstream Redhill Avenue.
Carbon Creek Channel (OCFCD Facility No. B01) from upstream Gilbert Street to downstream I-5 Freeway including B01P01 & B01B02
Peters Canyon Channel (OCFCD Facility No. F06) from Confluence with San Juan Creek Channel (F05) to downstream Barranca parkway.
PROPOSED 12-INCH VILLAGE OF HERITAGE
Lytle Creek Construction Area
Commercial, Industrial & Institutional Water Use Efficiency Upgrades
Reservoir Management System at 5 Domestic Water Reservoirs
Santiago Basins Intertie
Shallow Aquifer Pumping for Non-potable Uses
Tustin Legacy Wells 1, 2, 3, and 4
Surface Water Treatment Plant(s)
Recharge Basin Rehabilitation
Mentone Pipeline
Orange County/Beaumont Conjunctive Use Water Project
Yockey/Newland Storm Drain Line B-5 Phase 2
Santa Ana Gardens Channel (OCFCD Facility No. F02) from downstream Alton to Segerstrom.
Redlands Reservoir
San Bernardino Clean Water Factory – Phase III
MTBE Interim Remediation
Lytle Creek Turnout
Devil Canyon Construction Area
Central Feeder Pipeline
Alamitos Barrier Improvement Project
Yucaipa Lakes Pipeline Replacement
PVRWRF Biosolids Dryer Facility
RP-1 Cogeneration Facility Expansion
RP-2 Cogeneration Facility Expansion
Digester Gas Cleaing System
RP-2 Digester Gas System Modifications
Urban Runoff Reuse - Anaheim Hills Golf Course
San Bernardino Pump Station #1
Baseline Feeder Pump Station (East and/or West ALternative)
Construction of a Reclaimed Water Pipeline to Buena Park, California
San Bernardino Reservoir
Biodiesel Feedstock Production
Glen Helen Turnout
San Bernardino Pump Station #2
9th Street Feeder
South End Feeder
Baseline Feeder West Extension
City Creek Crossing
Morton Canyon Hydroelectric Generation Plant
DWR Pump Station Alternative 2
North Lake Project
RP-1 Secondary System Modifications
Agency Wide Lighting Improvements
Septic System Source Water Elimination Water Source Protection Project
Subsurface Recharge
Water Well Decontamination - City of Redlands
Yucaipa Connector
Orange Street Connector Pipeline
Alabama Street Well Field
Patterson Street Storm Drain Upgrade
Yucaipa Lakes Pump Station
Alabama Street Connector Pipeline
Foothill Pipeline Enlargement
Currently Active UsersThere are currently 8 users online. 0 members and 8 guests
Most users ever online was 92, 01-29-2012 at 09:49 AM.
OWOW Forum StatisticsWelcome to our newest member, Bruce Davis
Icon Legend